Germany: Preparation Begins for Offshore Wind Construction, Installation and...
In little over a month, the first-ever Offshore Wind Energy Summit with an exclusive […]
View ArticleLast Construction Vessel Leaves Site, New Phase Begins for Sheringham Shoal (UK)
The departure of the floating hotel Regina Baltica, which was the final construction vessel […]
View ArticleJapan: MHI Begins Testing of Large-Scale Wind Power Generation System
In December Mitsubishi Heavy Industries, Ltd. (MHI) commenced test operation at its Yokohama Dockyard […]
View ArticleUSA: RME Begins Wave Energy Project in Alaska
Resolute Marine Energy (RME) announced that its preliminary permit application to the Federal Energy […]
View ArticleGamesa Begins Transporting Largest Wind Turbine Blade Ever Built in Spain
Gamesa last night began transporting a 62.5-metre blade destined for a prototype of the […]
View ArticleConstruction Begins on Wind Turbine Service Vessel at Nordic Yards, Germany
The manufacturing work on a wind turbine service vessel for the Danish company DBB […]
View ArticleUSA: LEEDCo Begins Work on Icebreaker OWF
On Saturday, May 4, 2013, The Andrie Jack-Up Barge arrived on the shores of […]
View ArticleOffshore Wind Survey Begins off Maryland, USA
Coastal Planning & Engineering Inc., a Florida-based company, began surveying the seabed off the […]
View ArticleE.ON Begins Surveys along Proposed Rampion OWF’s Onshore Cable Route (UK)
E.ON will begin survey work later this month along the proposed onshore cable route […]
View ArticleUXO Survey Begins at Beatrice OWF Site
An unexploded ordnance (UXO) survey is taking place this month (January 2015) at the Beatrice […]
View Article
More Pages to Explore .....